Miami Beach Bandshell: audio, lighting, LED and rigging for concerts N022 | https://glmedia.tech/technical-help/bandshell-audio-led-rigging-concert/ Record the delivered configuration, remove additions with the responsible personnel and check equipment and site handback. All described tests are checks to perform; they do not establish completed physical tests, permits or verified capacities. Event, date, responsible party and contracted area: ______ Accepted plan occupancy, FOH, aisles, exits and accessibility: ______ Applicable permits, first load-in, curfew and confirmed extension: ______ Cases, weights, route, ramp and accepted handling methods: ______ Stage plan, risers, loads and supports; rigging awaiting review: ______ Zone A–E and phase demands; circuits and electrical responsibility: ______ Avantis, firmware, cards, patch and shared gain responsibility: ______ grandMA2 onPC, backup, fixture power park and guest integration: ______ LED configuration, template, format and border check: ______ Recording/streaming, channels, storage, destination and delivery: ______ Effects, models, reviews, fallback and weather plan: ______ Accepted changes, configuration rollback, removal and handback: ______