CAESARS FORUM: LED rigging, electricity and Clark County permits N010 | https://glmedia.tech/technical-help/caesars-forum-led-rigging-permisos/ Document check: October 17, 2026. Point and floor capacities, union task allocation, exclusive equipment and each effect’s authorization need confirmation for the specific room and project; this guide does not establish an approved installation. 1. Event, show management, contractor, applicable manual and revision: ____________________ 2. CAESARS FORUM, room/partition/booth or outdoor space, parcel and jurisdiction: ____________________ 3. Access, dock, time, freight route and surface protection: ____________________ 4. LED system, models, dimensions, complete weights and point/base reactions: ____________________ 5. Ceiling CAD, Encore review, points/limits and top/bottom elevations: ____________________ 6. Hardware, WLL, steel backup, centered pickup and installation documentation: ____________________ 7. Support/ballast, floor, operating limits, calculations/seal and outdoor inspector: ____________________ 8. Voltage/phases/consumption, connectors, distribution, continuity and authorized supplier: ____________________ 9. Authorized crew, minimums, credentials, insurance and confirmed union scope: ____________________ 10. Occupancy, egress, review/permit/PBI, inspection and issued record: ____________________ 11. Haze/laser/other effects: models, fluids/SDS, rehearsals, approvals and recovery: ____________________ 12. Submission dates, current estimate, approved revision and outstanding changes: ____________________