Javits Center: rigging, floor loads and permits for LED walls and effects N012 | https://glmedia.tech/technical-help/javits-led-rigging-permits/ The preparation worksheet collects review data. It does not certify capacity, stability, occupancy or permits for a real installation; retain accepted drawings, orders and applicable inspections with it. Event, edition, installation, opening and removal dates: Building, level, hall, booth and drawing revision: Organizer, Javits and provider of each service: Screens, hoists, trusses, accessories and weights: Points, reactions and total load per bay: Floor, supports, ballast, wheels and freight route: Voltage, phases, current, connectors and hours: Installation/operation labor, exemptions and credentials: Effect, model, fluid/SDS, drawing and detection: Permits, registrations, credentials, notices and inspections: Quotation, minimums, shifts, engineering and dismantling: Change, new acceptance and previous configuration: