Littman: microphones, monitors, lighting and theater load-in N073 | https://glmedia.tech/technical-help/littman-theater-sound-lighting-load-in/ Complete this worksheet with the theater before finalizing resources and schedules. It does not replace the accepted plan, quote or applicable permits. Separate authority permits, theater acceptance, organizer conditions, service contracts and technical checks. Acceptance of an AV list does not itself approve a structure or effect. Mark every change to layout, load, schedule or patch, request the appropriate review and keep the last accepted version so it can be restored without an improvised substitution. Event / date / plan revision / confirmed space: ____________________ Production entrance / dock / clear opening / route / packed items: ____________________ Seating configuration / cameras / blocked seats / accessibility: ____________________ Audio inputs / microphones / monitor mixes and positions / patch: ____________________ Initial lighting plot / focus changes / battens / restoration: ____________________ Proposed loads / accepted points and WLL / floor supports: ____________________ Assigned circuits / voltage / protection / authorized connection / intercom: ____________________ Unloading / checks / house opening / performance / restoration / load-out / calls: ____________________ House staff / assistants / insurance / quote / surcharges: ____________________ Effects / approvals by layer / changes / accepted fallback version: ____________________