LVCC: rigging plans, LED and approvals before installation N002 | https://glmedia.tech/technical-help/lvcc-rigging-led-plans/ During move-out, coordinate removal of rigging, electrical equipment, tie-backs and protective materials with the responsible contractors, leaving no loose suspended pieces. The downloadable worksheet records data and outstanding items; it does not certify calculations, inspections or approvals. Event / hall / level / room / booth: Move-in / installation / operation / move-out: DWG + DWF layout / revision / status: PDF or DWG rigging / revision / status: Equipment / weights / dimensions / point and beam loads: Supports / ballast / floor / move-in route: CSM / Safety and Fire Prevention / Facility Maintenance: Authority / permit / scope / status: Organizer / event manual / designated contractors: EAC / COI / ESCA / credentials / authorized tasks: Power / 24-hour outlets / effects / documentation: Changes / inspections / acceptance / move-out / outstanding items: