MACC: LED suspension, outside AV suppliers and load-in planning N068 | https://glmedia.tech/technical-help/macc-rigging-av-suppliers-load-in/ Complete this worksheet with the venue and production team. It does not authorize points, loads, connections, seating capacity or effects. Keep accepted plans, rigging plot, loads, electrical distribution, patch, schedules and versions. If weight is added, a support moves, or an exit, audience zone or effect changes, submit the revision to the party that approved that scope before implementation. Keep the previous design available to restore it if the change is not accepted. Record surface and equipment condition with the CSM at move-in and move-out. Accepted building, level, room, division and plan: ____________________ Applicable jurisdiction, authority and application: ____________________ Screen, truss, motors, weights, reactions and approved points: ____________________ Floor, wheels, supports, ballast and accepted protection: ____________________ Dock, slot, door, freight elevator and load-in route: ____________________ Confirmed AV provider, exclusivity, agreement and COI: ____________________ Audio patch, zones, source, operator and saved values: ____________________ Power and network: distribution, connection, service and responsible parties: ____________________ Effects, detection, plans, engineering and pending inspections: ____________________ Schedule, current costs, versions and restoration: ____________________