Mandalay Bay: preparing rigging plans, LED walls and approvals N001 | https://glmedia.tech/technical-help/mandalay-bay-rigging-led-plans/ During load-out, follow the agreed scope with the responsible providers. Include removal of suspension materials and the handover inspection. The downloadable worksheet records documentation and outstanding items; it does not certify calculations, inspections or authorizations. Event / room / level / contracted area: Load-in / use / load-out: Drawing and revision / acceptance date: Equipment / dimensions / weights / points / supports: Calculations and structural documentation / revision: Assigned provider by task: rigging / LED / power / load-out: Venue: document / scope / status: Authority: permit / activity / configuration / status: Organizer: location / height / event manual: Effects: type / documentation / permit / supervision: Pending changes / responsible party / next action: Load-in and handover inspections / records: