Moss Lab Theater: rigging grid, lighting patch and production in Cutler Bay N067 | https://glmedia.tech/technical-help/moss-lab-grid-lighting-patch-production/ Complete this worksheet with the venue and production team. It does not authorize loads, connections, seating capacity or effects. Keep the accepted plan, loads, patch, electrical distribution and version. Any change in weight, location, route, effect or program must return to the party that approved that scope before implementation. Keep the previous version so it can be restored if the change is not accepted. Accepted room, building, access and plan version: ____________________ Configuration, seating, circulation and confirmed capacity: ____________________ Suspended equipment, weights, reactions and accepted points: ____________________ Floor supports, wheels, protection and case route: ____________________ Fixtures: accepted model, manual, mode, address and patch: ____________________ Saved show, house control and restoration plan: ____________________ Audio: source, identified mixer and assigned input/output: ____________________ Power and network: requirements, distribution, responsible person and pre-event check: ____________________ Effects: equipment, venue acceptance, permits and inspections to confirm: ____________________ Contract: schedule, insurance, personnel, costs and change review: ____________________