Moss Main Stage: orchestra pit, linesets and fire curtain N028 | https://glmedia.tech/technical-help/moss-main-stage-pit-linesets-fire-curtain/ Complete the worksheet with the accepted Main Stage plan and project confirmations. It does not establish capacity, batten load, booking or permit. Agree on change and restoration time and costs: repositioning may incur additional labor. For an unaccepted revision, restore the last approved plan. At handover, authorized personnel must restore agreed soft goods, positions, files and routes, check floor and inventory and record acceptance. A room booking does not replace those approvals. Event, Main Stage, address and manual revision: ____ Accepted plan and section; portal opening and scenery positions: ____ Pit: position, accepted load, access, edges and operator: ____ Sales plan: AA/BB rows, FOH, cameras, accessibility and exits: ____ Linesets: current schedule, installed equipment, weights, reactions and accepted capacity: ____ Shell: ceilings, towers, travel and maneuvering reservations: ____ Projection: projector, lens, screen, line and content check: ____ Fire Curtain: descent plane clear through every show change: ____ Loading: complete packages, doors, dock, freight elevator and floor protection: ____ Power and signals: voltage, distribution, near-fill, files and operator: ____ Effects and approvals: model/manual, venue, authority, organizer and contract: ____ Dated costs, change review, agreed restoration and final handover: ____