Navy Pier: rigging, LED and load-in at Aon Grand Ballroom and Festival Hall N005 | https://glmedia.tech/technical-help/navy-pier-aon-festival-led-rigging/ Also confirm load-in and load-out windows, cancellations and late-change charges in the event contract. The downloadable worksheet records responsibilities and open items; it does not calculate loads or establish approval, inspection or a permit. Event / space / level / use: Load-in / operation / load-out: Document / revision / applicability confirmation: DWG / rigging plot / points / loads: Engineering / signature / seal / required inspection: Motors / truss / LED / accessories: Provider / trade / task / responsible party: Floor / supports / ballast / route: Door / turns / stage / confirmed dimensions: Power / phases / connectors / handover and removal: Effects / SDS / Chicago / IEMA-OHS / FDA / FAA: Acceptances / changes / costs / cancellations / open items: