OCCC Orlando: LED wall rigging, power and effects permits N009 | https://glmedia.tech/technical-help/occc-orlando-led-rigging-permisos/ Document check: October 17, 2026. This guide prepares enquiries and submissions; it does not assign points, calculate structures or establish approval of a particular installation. 1. Event, dates, show management and general services contractor: ____________________ 2. Building, hall, booth and first contracted access: ____________________ 3. Docks, current construction route, unloading and ESCA/approved credentials: ____________________ 4. LED/sign, models, dimensions, complete weight and point/base reactions: ____________________ 5. Drawing and revision; trim to top and bottom elevation; OCCC-confirmed points: ____________________ 6. WLL, hardware, steel backup and calculations/seal required in writing: ____________________ 7. Ground support, ballast, surface protection, floor limits and service route: ____________________ 8. Voltage/phases/consumption, OCCC delivery and exhibitor/EAC distribution: ____________________ 9. Haze: machine, labeled fluid, location, rehearsals/show, detection and approval: ____________________ 10. Laser: model/class, beam drawing, OCFR, DOH, FDA and FAA as applicable: ____________________ 11. Deadlines 30 days/three weeks/21 days: document, milestone, recipient and confirmation: ____________________ 12. Estimate and minimums, load-in/out, approved revision and outstanding changes: ____________________