Peacock Foundation Studio: grid, technical access and AV installation N060 | https://glmedia.tech/technical-help/arsht-peacock-studio-grid-av-production/ If audience, layout, points, supports, power, effects or schedule change, submit an identified revision and keep responses by scope. Preparation worksheet: not a reservation, permit, calculation or installation approval. Event, date, program and expected audience: PFS, room setup, current plan and accepted capacity: Usable dimensions, obstacles, stage and circulation: Grid or supports: weights, distribution, method and acceptance: Power, circuits, routes and connection responsibilities: Sources, destinations, formats, patch and backup: Stage Door, credentials, cases and complete loading route: Lift, actual model, availability, operator and floor: Effects, Fire Watch, permits, conditions and alternative design: Insurance, crew, equipment, costs, contract and revisions: