Pinecrest Gardens and Banyan Bowl: sound, setup and thunderstorm suspension N024 | https://glmedia.tech/technical-help/pinecrest-gardens-banyan-bowl-sound-setup-weather/ Complete this worksheet with the venue and production team before dispatch. Distinguish accepted and pending items; it does not replace permits, a contract, structural calculations or an emergency plan. At the end, remove your equipment and materials within the accepted window, return venue property to its authorized location and leave the area as received. Record patch, levels, connections and handover condition with the technician. Overrunning, failing to clean or causing damage may incur charges or deposit forfeiture under the rules; check closure with staff. Event, date, permit holder and exact permitted space: ______ Plan, capacity, ADA, exits, FOH and equipment footprints: ______ Use permit and authority reviews, pending/accepted status: ______ Loading, checks, performance, cleanup and final-departure window: ______ Cases, weights, vehicle, route and protected surfaces: ______ Sound system, interface, zones, level and operator: ______ Initial patch, signal check and accepted recovery configuration: ______ Rigging, supports, ballast, calculations and competent review: ______ Demand, circuits, connections and authorized personnel: ______ Effects by model and effects-free version: ______ Weather plan, shelters, responsibilities and reopening conditions: ______ COI/endorsements, crew, written changes and handback: ______