JW Marriott Miami Turnberry: rigging plans, providers and permits N017 | https://glmedia.tech/technical-help/turnberry-aventura-rigging-permits/ This worksheet prepares the hotel project; it does not establish a reservation, loads, occupancy, connection, accepted insurance or issued permits. 1. Hotel, room/divisions, location and event date: 2. Contract and load-in, test, show and strike hours: 3. Current room point plan and project revision: 4. CAD, ZIP package, submission date and review status: 5. Complete inventory, motors/chains and calculated point loads in lbs: 6. Heights, supports, cable bridge, picks and cable routes: 7. Décor/signage, construction, attachments and applicable acceptance: 8. Floor, wheels, ballast, protection, lift and unloading route: 9. Electrical equipment, consumption, connection, patch and authorized operators: 10. Rigging crew, staffing, duties, equipment and schedule: 11. Effects, models, SDS, municipal process and fire approvals: 12. Costs, insurance, revised changes and accepted prior configuration: