Arsht Knight Concert Hall: rigging, audio patch and show setup

Knight Concert Hall (KCH) at the Arsht Center is at 1301 Biscayne Boulevard, City of Miami, Miami-Dade. It is a different venue from James L. Knight Center. This guide uses the venue-linked specifications, Rev. 7.3.25; their references are not an accepted plan for your show.

Compare the complete package with the loading route

The dock is on NE 13th Street between Biscayne Boulevard and North Bayshore Drive. It has three bays and accommodates two 53 ft trailers; cabs do not fit inside the gate. Confirm maneuvering, waiting and vehicle sequence before dispatch. Published backstage clearance on the stage route is 6 ft 9 in: measure every item with base, wheels and packaging in its accepted transport orientation.

The Stage Door is at North Bayshore Drive and NE 13th Street. The dossier requires Security check-in, identification and authorization to work in or visit the hall. Separate personnel credentials from freight access; if a case cannot fit the confirmed route, revise packaging or equipment before shipping rather than improvising another entrance.

Close stage, FOH and seating plans before ticket sales

The technical table lists a stage width of 79 ft and depth of 44 ft 6 in; the elliptical piano lift measures 18 ft × 9 ft, and the large pit configuration is 63 ft 10 in × 27 ft. Request a plan with accepted levels and positions: these dimensions do not describe a free rectangular area or authorize lift movement or applied loads.

FOH is 9 ft deep × 8 ft wide, expandable to 16 ft wide, at 66 ft 7 in from the plaster line. Expansion requires advance written notice for seat removal and ticket-sales adjustment. Submit consoles, racks, cameras and circulation within that footprint; do not expand it during load-in.

The dossier states 2,166 seats but its table ends at 2,167; other official pages publish 2,100 and 2,200. Do not select a ticketing figure: request event capacity and seating plan including FOH, pit, chorus and blocked positions. Platform and riser changes require advance coordination, time and budget.

Review rigging without treating the canopy as an open grid

The acoustic canopy has three moving sections and very limited additional rigging. The dossier requires advance discussion and weight calculations before hanging any element; it publishes no free load per point. Submit complete LED, truss, motor and accessory weight, distribution, position, height and method for review. If suspension is not accepted, review a supported alternative with floor reactions, ballast and protection.

The venue has an IATSE Local 500 agreement. House equipment, including consoles, personnel lifts, stage lifts and canopy, is operated by an Arsht Department Head or a stagehand designated by the venue Steward. Set installation, connection, operation, inspection and removal roles; that operating rule alone does not define every hiring scope. Personnel lifts are shared among stages and must be coordinated before load-in.

Assign power by location and use

Use Show Power Distribution to submit demand, not to add amperages as free power. Confirm voltage, phases, protection, connectors, route and who connects, checks and removes distribution. The 5-wire disconnect label does not authorize an adapter or self-performed connection. Keep feeds identified for sound separate and request LED, lighting and video allocation.

Projection receptacles do not confirm a projector, lens, screen, format or signal path. Request those details and the assigned manual before preparing throw distances or connections; do not assign another campus room’s inventory to KCH.

Assign power by location and use
Dossier locationPublished referenceUse limit
Loading Dock400 A, 200 A and 100 A; 5-wire disconnects.Allocation and availability require confirmation.
Stage Left60 A isolated for sound; 5-wire disconnect.Do not automatically reassign to LED.
Upstage Left100 A; 5-wire disconnect.Confirm point and route.
Back wall400 A; 5-wire disconnect.No guaranteed available power.
Stage Right100 A; 5-wire disconnect.Confirm protection and connection.
Basement200 A isolated for sound; 5-wire disconnect.Retain accepted use and responsible role.
Center Box Tier 1Two L6-30 receptacles for projection.Does not establish an included projection package.

Separate local inputs from shared signals

Prepare a list of source, physical connector, FOH channel, monitor channel, destination and patch responsibility. The dossier describes paths that are not equivalent between consoles. With the operator, check signal at the input and then at the agreed destination: hearing a source in the house does not establish its arrival on stage.

For a signal that must be shared, check its split assignment before raising monitor level. For local click or talkback, check the stage destination and that it has not been added to the house program. Record the previous patch and restore it if a change reaches another destination. Do not change network, gains or show files without the operator and assigned-system manual.

Separate local inputs from shared signals
Listed systemPublished limitWhat to confirm
FOH — Yamaha Rivage PM7Up to 80 inputs; 28 are not sent to the monitor/split console.Which are local and which the show needs to share.
Monitors — Yamaha CL564 inputs; 53–64 may remain on stage only, without FOH send.Click, talkback and local sources within the accepted patch.
Stage split — Whirlwind52 channels, 3-way isolated.Physical correspondence and routes; do not infer console numbering.

Program cues without changing the lighting hang

The approximately 93 automated fixtures must be used as hung. The dossier lists Grand MA3 Light with 4096 parameters and Grand MA3 RPU with NPU backup; confirm equipment, version and effective capacity before transferring a show. This list certifies neither file compatibility nor control reconfiguration.

House Lights, Work Lights and non-dims use the separate Paradigm system, with controls at Stage Left, Stage Right and the FOH booth. Agree who operates each state and reserve programming time. Do not assume a show cue also controls house lighting.

Program cues without changing the lighting hang
Check to performWhat to observeHow to continue or recover
Accepted-patch cueOnly the intended fixtures respond.If another fixture changes, stop the sequence, restore the previous state and review assignment with the operator.
Agreed show/house transitionShow and house lighting reach their intended states.Separate the show cue from Paradigm control; do not alter safety functions.
Source intended for FOH and monitorsSignal at both inputs and only at requested destinations.If one branch is missing, check its patch/split before level; restore the previous route if unverified.

Submit effects, costs and revisions separately

For open flame, smoke, haze or pyrotechnics, the dossier specifies City of Miami Fire Rescue inspectors and Fire Watch requests to Production as part of the advance, no later than two weeks before the event. Include rehearsal, equipment, fluid and hours to confirm coverage. Do not test an effect before resolving acceptance; these specifications neither authorize lasers nor set Fire Watch rates.

Separate authority permits or inspections, venue technical acceptance, organizer program, contract/insurance and technical checks. The rental page requires liability insurance and excludes event staff, production labor and equipment from base rental. Request a current quote covering staffing, programming, Fire Watch, load-in and strike; no total cost is confirmed for your show.

Submit an identified plan and patch revision if FOH, seating, canopy, rigging, floor, power or effects change. Identify affected acceptances and retain the previous configuration until review is complete. Do not transfer these conditions to CST, Peacock Foundation Studio or another room because they share a campus.

Frequently asked questions

Does a case that enters the dock reach the stage?

Published backstage clearance is 6 ft 9 in. Compare the complete package and transport orientation with that passage and the confirmed route. If it cannot fit, revise packaging or equipment before dispatch.

Can I expand FOH on load-in day?

Expansion from 8 ft to 16 ft wide, with 9 ft depth, requires advance written notice for seat removal and ticketing adjustment. Submit the complete footprint and obtain an accepted plan before selling those positions.

Can the canopy support a suspended LED screen?

No free load per point is published. Every hanging element requires advance discussion and weight calculations. Submit distribution, position and method; a floor-supported alternative also needs reactions, stability and circulation review.

Why might a PM7 input be missing at monitors?

The dossier states that 28 of its 80 inputs are not sent to monitors/split. Identify physical route and assignment before raising level. The CL5 also has local stage sources; do not infer a link from channel numbers.

Does the show console control all house lights?

House Lights, Work Lights and non-dims use separate Paradigm control. Coordinate operators and states with the show cue and check each transition. If an unexpected destination changes, restore the previous state and review the patch.

When should I request Fire Watch for haze?

The dossier requires requests to Production during the advance, no later than two weeks before the event. Submit equipment and hours, including rehearsal, to confirm scope and cost. The deadline is not a permit or authorization to operate the effect.

Does room rental include technicians and equipment?

The official page excludes event staff, production labor and equipment from base rental and requires liability insurance. Request a quote for the accepted scope, including setup, operation, programming, effects and strike; do not calculate the total from the room alone.

Official documentation

Technical reference Rev. 7.3.25, currently linked by the venue. The final sheet retains Rev. 4.19.2021: confirm its shared equipment’s currency and availability. Auxiliary plans and the project require separate validation; the list assigns no loads, power or permits.