Rigging and power
ESER01-03SK — steel sling WLL 1 t, 1.5 m
Plan your sling inquiry around its identification and the intended system arrangement. Gather the label, certificate and intended-use details to assess a suitable option with the qualified person responsible.
Identification and scope
- Brand stated in the record
- Acer
- Equipment name
- ESER01-03SK — steel sling, recorded WLL 1 t and effective length 1.5 m
- Location
- Ask about availability and location
- Supply for the event
- Ask about options for the planned date and scope
- Configuration or function
- ESER01-03SK steel sling; recorded WLL 1 t and effective length 1.5 m. Check the label, certificate and capacity for the intended configuration.
You can start with the intended use, date and venue even if you do not yet have all the setup references. We will review sling identification, system details and supply options.
Information to prepare this item
- Component identification, nameplate and documentation; actual assembly configuration.
- Planned load, geometry, supports and accessories, with review by the qualified person responsible for the actual configuration.
Match the sling to its documentation
Compare the brand stated in the record with the proposed unit’s label and certificate. Gather model, identification and inspection details to review the recorded WLL 1 t and effective length 1.5 m for the intended configuration.
Prepare the details of the intended setup
| Point | What to record | How to proceed |
|---|---|---|
| Identification and documentation | Label, certificate and inspection of the proposed sling | Confirm that the unit and documents match |
| Application | Planned load, geometry and system arrangement | Review capacity for that use with the qualified person responsible |
| Components and supports | Planned accessories, connection points and supports | Resolve selection and discrepancies using the setup documentation |
The recorded reference helps prepare the inquiry; capacity for the intended use is confirmed with the label, certificate and system review. If details are missing, record what is needed for technical assessment before use. This page does not establish that an inspection has been carried out or describe a lifting sequence.
Topics to discuss
- Component identification
- Configuration and documentation
- Assembly coordination
- Inspection and recordkeeping
Before applying settings, identify the complete equipment variant and consult its documentation.
Continue the inquiry
- What to coordinate with the hotel or venue before AV setup
- Event stages: choosing size, height and access
These guides cover related tasks. Check the model each guide addresses before applying its settings to this equipment.