Multipole power distribution
Socapex power distro: what to document for your event
A distro using multipole connectors can organize several power destinations along a cable route. Assessing this unit requires knowing what each output supplies, which cable goes with it, and which equipment it will serve.
Identification and scope
- System reference
- GLMedia
- Equipment name
- GLMedia — Socapex power distribution unit
- Location
- Ask about availability and location
- Configuration or function
- Socapex distribution; configuration and ratings to confirm.
You can start with the equipment you need to power and the venue, without a final list or diagram. Availability for your date will be confirmed when preparing the proposal.
Prepare your inquiry
- Exterior photos, nameplate, and complete input/output labels, without opening the unit.
- Equipment by destination and the supply requirements in each model’s manual.
- Multicore reference, length, and breakout; documented output and circuit mapping.
- Venue supply details and proposed unit location, access, and environment.
Prepare photos and records with the unit out of service and secured de-energized by qualified personnel. Keep the enclosure closed and do not touch contacts. Stop use if you find damage, notice a burning smell, or a protective device trips; have the unit checked before using it again.
What to identify
Obtain the distro manufacturer, model, and nameplate. “Socapex” describes a connector family; it does not establish who built the unit or which protections it contains.
Request documentation showing whether outputs provide direct, switched, or dimmed power. Amphenol shows this family in lighting and dimmer applications; the connector alone does not identify this unit’s function.
Prepare the details for reviewing event power
| Point | What to record | How to proceed |
|---|---|---|
| Unit and documentation | Model, nameplate, diagram and intended components | Gather references for the qualified person’s review |
| Supply and demand | Venue information, equipment to power and intended use | Review the required configuration with the qualified person responsible |
| Outputs and path | Proposed destinations, cables, connections, access and route | Define the scope and coordination of the documented distribution |
The qualified person responsible reviews the supply, protection, connections and assembly condition. Record the information and discrepancies they need to assess; this page prepares the inquiry and does not provide a connection, disconnection or energized handling sequence.
Technical questions
Does Socapex mean a dimmer-controlled output?
No. Request the distro manual and functional diagram; the connector name does not identify the supply type.
Can this supply projectors or LED screens?
Send the power requirements for those models and the distro details. Output type, voltage, protection, cabling, and loads need review before defining the assembly.
Is breakout numbering enough to identify what it supplies?
Labels help record the route, but require documented correspondence with the source circuits. Do not guess missing or conflicting mapping.
What changes if I need another destination at the end of the run?
Send the added equipment’s location and power requirements, along with the proposed cable route. The distribution and circuit mapping need review before adding a branch.
To prepare the proposal, identify the unit and gather its nameplate, manual and corresponding diagram.
Alternatives to compare
Compare direct distribution with switching or dimming only after establishing the load requirements. Do not assume an output suited to a lighting fixture is appropriate for video electronics.
Individual runs or local distribution near the equipment may also be options. Compare documentation, access, and demand without assigning capacity from the number of connectors.
Location and supply
Include the country, city, and venue, and request the venue’s supply details. Voltages, color conventions, and requirements can differ between the United States, Argentina, and other jurisdictions. Installation and commissioning need review by personnel qualified for the event location.
Sources and documentation
- Amphenol Socapex — Dedicated Solutions for Entertainment, pp. 2–6 — 419AR connector references; use the distro’s own documentation to establish its wiring.
- r/VIDEOENGINEERING — 6 Projector Circuits Over Socapex — third-party video-load question; does not establish compatibility or capacity.
Use the exact model’s documentation to complete identification and review its operating conditions.
Continue the inquiry
- What to coordinate with the hotel or venue before AV setup
- Event stages: choosing size, height and access
These guides help coordinate the venue and stage platforms. Power distribution needs review against the unit documentation by the person qualified for the event location.
Other items from the same brand
Help us improve this guide
Is an explanation missing, did you find an error, or did you solve something differently? Tell us on WhatsApp.
WhatsApp opens with an editable draft. Review it and send it if you choose. Do not include passwords, keys or client information. Contributions are reviewed before being added to guides; they are not published automatically.