Rigging and power
LED ground support ballast
Plan the ballast inquiry together with the LED ground support system and intended layout. Identifying the system and its documented requirements allows information to be gathered for the proposal’s technical review.
Identification and scope
- Manufacturer or brand
- Check the identification on the unit
- Equipment name
- LED ground support ballast
- Location
- Ask about availability and location
- Supply for the event
- Ask about options for the planned date and scope
- Configuration or function
- Ballast for LED ground support; weight per unit pending.
You can start with the intended screen and space, even without all measurements or a final diagram. We will review which system and site information is needed to coordinate the proposal.
Information to prepare this item
- Component identification, nameplate and documentation; actual assembly configuration.
- Support system, screen, loads, geometry, supports and site conditions, with review by the qualified person responsible for the actual configuration.
Relate the ballast to the support system
Gather identification and documentation for the proposed ground support, screen and ballast elements. Weight per unit remains pending; the mass and layout required for the system are defined through review by the qualified person responsible and documentation applicable to the actual configuration.
Prepare system and site details
| Point | What to record | How to proceed |
|---|---|---|
| System and documentation | Support, screen, configuration and proposed ballast identification | Gather documented requirements for qualified review |
| Site and layout | Planned geometry, supports, surface and conditions of use | Coordinate the venue information needed to review the system |
| Preparation and supply | Date, city, access and pending system and ballast details | Agree on scope, information to resolve and supply options |
If weight per unit or support documentation is missing, record the pending information for review. This guide does not calculate ballast mass, distribution, wind limits or ground capacity, or validate stability or compatibility; it also does not describe an assembly sequence or claim a completed system test.
Topics to discuss
- Component identification
- Configuration and documentation
- Assembly coordination
- Inspection and recordkeeping
Before applying settings, identify the complete equipment variant and consult its documentation.
Continue the inquiry
- What to coordinate with the hotel or venue before AV setup
- Event stages: choosing size, height and access
These guides cover related tasks. Check the model each guide addresses before applying its settings to this equipment.