Rigging and power
Truss bolt set
Plan the bolt set together with the intended connection and truss references. Component identification and system documentation allow the set’s composition to be reviewed for the setup.
Identification and scope
- Manufacturer or brand
- Check the identification on the unit
- Equipment name
- Truss bolt set
- Location
- Ask about availability and location
- Supply for the event
- Ask about options for the planned date and scope
- Configuration or function
- Complete truss bolt sets; references to confirm.
You can start with the structure you want to prepare, the date and venue, without a final component list. We will review system references, set composition and supply options.
Information to prepare this item
- Component identification, nameplate and documentation; actual assembly configuration.
- Planned truss, connections, components, loads, geometry and supports, with review by the qualified person responsible for the actual configuration.
Match the components to the intended connection
Gather manufacturer, reference, identification and documentation for the set and truss. Confirm the intended composition for that connection and record the proposed component references; similar shape or dimensions do not by themselves establish a match with the system.
Prepare the connection details
| Point | What to record | How to proceed |
|---|---|---|
| Set and documentation | References, identification and documented composition of the proposed set | Confirm the components for the intended connection |
| Truss and connection | System, sections, connections and setup arrangement | Review the match using the documentation and with the qualified person responsible |
| Preparation and supply | Connection count, date, venue and known references or missing items | Resolve the details needed to define scope and options |
If component references or system documentation are missing, record what is needed for technical review. This page prepares the inquiry; it does not assign dimensions, grade, tightening torque, capacity or compatibility, or describe an assembly sequence.
Topics to discuss
- Component identification
- Configuration and documentation
- Assembly coordination
- Inspection and recordkeeping
Before applying settings, identify the complete equipment variant and consult its documentation.
Continue the inquiry
- What to coordinate with the hotel or venue before AV setup
- Event stages: choosing size, height and access
These guides cover related tasks. Check the model each guide addresses before applying its settings to this equipment.