Skip to content
Get a quote
🇺🇸 English

Exhibits · Practical guide

From booth plan to usable dimensions, graphics and freight access

Contracted space, finished interior, graphics and shipping packages have different dimensions. Identifying them in one coordination package helps the designer, AV team and suppliers work from compatible references and directs changes to the people affected.

Wall thickness and junctions affect the finished interior

In plan, draw both wall faces plus finishes or projections belonging to the selected solution. Distinguish outside dimension, centerline and finished inside face. If the system or finish changes, review clear dimensions rather than moving a single drawing line.

As an identified system example, Aluvision's Starter Kit 1 lists 992 × 2480 mm Omni-55 frames along with other sizes and finishing profiles. Frame size alone does not establish the complete wall thickness or interior dimension for every arrangement. Request the section and junction details of the proposed assembly.

To find clear interior width, subtract the space taken up by each wall from the outside width W: clear width = W − left wall thickness − right wall thickness. Use the full thickness on each side, including finishes. Take those values from the design section; the system’s trade name alone does not establish them.

Separate the frame, visible image and production artwork

Identify each face or panel with the same code on the plan and graphic request. Record visible size, orientation, screen interfaces and areas concealed by furniture. Production artwork also needs the supplier's exact template with confirmed scale, bleed and margins.

SEG Systems' measurement guide identifies specific frame references, while its artwork instructions distinguish printing processes. These show why frame measurement, visible image and artwork size are not interchangeable. Do not apply that supplier's template to a different system based on appearance.

Coordinate dimensions with the graphic and scenic suppliers. If a junction or panel changes, update the code and identify the affected file. The AV plan records the interface; material and production specifications remain with their suppliers.

Dimensions shared by design, graphics and AV
ReferenceWhat it identifiesWhat to request
FrameExact system and componentSupplier drawing and section
Visible imageImage remaining in viewDimensions and concealed zones
ArtworkProduction fileConfirmed template, scale and bleed
JunctionScreen or adjoining panel interfaceShared reference and revision

Compare the arriving package against the complete access route

Request packed dimensions in the intended transport orientation, including case, protective packaging and planned handling components. Installed product size alone is insufficient. For example, Peerless-AV KIPC2555 datasheet LIT-1572 rev.5 separates product and package dimensions: that package is listed as 38.00 × 86.00 × 27.00 in, width × height × depth.

Use those dimensions to request venue confirmation of the route: entry, clear door width and height, turns, thresholds and elevator if applicable. Record elevator car and door separately, together with use and transport conditions confirmed by the responsible parties. A package being smaller than an opening in two dimensions does not establish that it can complete the turns or route.

If a conflict appears, ask the supplier about another shipping arrangement or solution, then review the route with the venue again. A door photo helps identify it; confirming access requires dimensions and use conditions. The transport team also needs to review handling equipment and loads; consult the supplier before changing any components.

Use scenarios when the plan is still evolving

Compare options using the same starting information. State what each keeps, changes and needs confirmed. If a space has not been measured, record the assumed dimension and explain how a different measurement would affect the proposal.

For example, if the wall section is missing, compare an image in front of it with an integrated image, identifying unconfirmed envelopes. If freight access is pending, identify which option depends on a particular package. The next designer, supplier or organizer response should resolve a decision.

Missing information and the decisions it resolves
Missing informationOptions to compareResponse needed
Wall thicknessImage in front or integratedSection and final envelope
Permitted heightTwo image envelopesConfirmed height zone and rule
Freight accessDifferent configuration or shipping arrangementConfirmed route and conditions
GraphicsTwo visible-face compositionsSelected system's template

Deliver the plan with a revision, change list and open questions

Use an identifiable file name: show, booth, date and revision. On the drawing, state units, scale where applicable, dimension origin and status of important values. Distinguish a concept sketch from construction or technical review documents: a sketch is not a permit or structural calculation.

Include a short change list and a respondent for each open question. If a dimension changes, identify affected screens, walls, furniture, graphics or packages. Keep previous revisions as history, clearly marking the current one for the discussion.

When a response arrives, retain its document, date, author and exact scope. Graphic approval does not approve support, floor or rigging. Share the updated package with the people involved so each discipline reviews its own scope.

Frequently asked questions

Can I send a plan before wall thickness is final?

Yes. Send the available version and identify the system being considered and the missing dimensions. We can compare options and show which change when the wall section is confirmed.

Can visible image size be used to order printed graphics?

It is a coordination dimension. The producer needs to confirm the model-specific template, scale, artwork size and margins for its process before production.

Can we choose equipment from an elevator photo?

The photo helps identify the access point. Request clear car and door dimensions, route turns and venue-confirmed use conditions.

What should we send so everyone uses the same plan?

A file with an identified revision, date, units, changes and open questions, plus relevant documents. State which revision it replaces and who reviews each topic.

Sources and documentation

Phone+1 (786) 488-3435
Discuss my eventInstagram Facebook YouTube