MGM Grand Conference Center: AV, rigging, power and permits

MGM Grand publishes an official Conference Center library with a planner guide, policies and room plans. Its rules distinguish meetings, general sessions, exhibits and exclusive services. This guide helps scope production without conflating the Conference Center with Grand Garden Arena or treating a design as approved.

1. Building and scope

MGM Grand Conference Center and Grand Garden Arena appear in materials for the same property, but are distinct spaces. The facilities guide divides the Conference Center by level and shows Marquee Ballroom, Chairman’s Ballroom and other rooms. Confirm contract, level, division and route; do not apply arena rules to the center.

2. Rooms and capacities

MGM’s chart lists dimensions, ceiling heights and capacities by room and combination. It warns that counts do not account for staging, AV, dance floor or catering. Position LED, FOH, aisles and exits on the exact configuration plan; marketing capacity does not establish floor or rigging loads.

3. AV and rigging

Version 12.25 policies call Encore the preferred AV provider and exclusive rigging provider, including truss, motors, hardware and labor. Encore AV is required for meetings and breakouts; General Sessions are excluded from that specific mandate, and outside production is allowed subject to policies. Obtain the production and vendor guidelines for the contract before assigning work.

3. AV and rigging
ServicePublished ruleOpen item
Overhead riggingEncore exclusivePlots and loads to review
Breakouts and meetingsEncore AV requiredContract scope
General SessionsException to AV mandateOutside production subject to rules
InternetMGM exclusiveService and network TBD

4. Power and network

The same policies assign electrical work, portable wiring and distribution at exhibits and events to Edlen; they also describe Encore as exclusive for power equipment and services. This overlap does not identify who makes a particular connection without CSM clarification. MGM states it exclusively supplies internet, including Wi-Fi; routers and production networks require permission under the policies.

4. Power and network
PartyDocument statesVerification
EdlenEvent electrical distributionConfirm scope
EncoreRigging and power under policiesResolve overlap
MGM / CSMSpace, plans and operationsHotel approval
CCFDApplicable plans and permitsAuthority approval

5. Plans and authority

The general service contractor prepares exhibit plans for Clark County Fire Department approval; MGM reviews outside production/decorator plans before submission. Changes require new approval. Keep the approved plan onsite and verify the applicable attendance threshold and process with the CSM, because the two PDFs phrase the threshold differently.

6. Haze, pyro and video

The policies call for haze or pyrotechnic schedules to the CSM 30 days in advance. Pyro and flame effects require a CCFD permit and fire watch when the safety system is put in test mode; the hotel cannot alter authority-approved plans. Recording, broadcasting and banners have separate conditions.

7. Loading and protection

MGM requires dock security during load-in and load-out. Obtain current dock, operating address, hours, elevator, floor protection and waste route for the exact room from the CSM; a guest page cannot establish production access. Transport routes and load ratings were not confirmed in the reviewed documents.

8. Review package

Prepare contract, rooms, level, configuration, audience/egress plan, rigging loads, electrical demand, network, cables, dock, schedule, effects and vendors. Record MGM/CSM, Encore, Edlen, organizer and CCFD responses separately and submit revisions before load-in.

Frequently asked questions

Can an outside production company run a general session?

The policies allow outside production subject to guidelines and exclude General Sessions from the specific Encore AV mandate for meetings and breakouts. Exclusive rigging and other conditions still apply; confirm the contract with the CSM.

Does Edlen or Encore connect production power?

MGM documents assign electrical tasks to Edlen while describing Encore power services. Request a written responsibility matrix from the CSM for the room, event type, distribution and actual connection before pricing or installation.

Official documentation

Reviewed October 18, 2026. Official MGM Grand sources: Meeting Planner Guide and Events & Convention Services Policies & Procedures, both version 12.25 and 18 pages; Conference Center Facilities Guide, 14 pages; Grand Conference Center page and document library. Directed review. The Encore power / Edlen electrical split needs CSM confirmation by room and service. No rigging CAD, contract or event permit obtained.